(757) 461-6757 engineers@vansantgusler.com
Vansant & Gusler, Inc. Consulting Engineers
  • Home
  • About Us
  • Our Work
    • Federal & State
      • P471 Seal Team Ops
      • Chesapeake Schools
      • Renovate BEQ 288
    • Higher Education
      • Walter L. Rice River Complex
      • ESL VIMS Complex
      • Renovate Bice House
    • Manufacturing & Industrial
      • Caterpillar Facility Carter Machinery
      • ERC Various Projects
      • Stihl Various Projects
    • Commercial
      • DoubleTree Hotel Lobby
      • FedEx Warehouse
    • Healthcare
      • Doctor’s Hospital OR & MRI Addition
      • Office Building HVAC Assessment
      • Varian Edge Synergy
    • Historic & Cultural
      • Oozlefinch Brewery
      • Nauticus Naval Museum
      • Trinity Episcopal Church
  • Our Skills
  • Our Team
  • Partner With Us
  • Contact Us
Select Page

P471 Seal Team Ops Slider

by Rachel Clark | Jun 20, 2019

  • Multiple pumps and valves connected to large red feed pipes in the mechanical room of the building
  • Various sizes of flow valves and vertical white pvc piping carrying chilled supply and return water to the building
  • Large grey air handling unit with a silver flexible ductwork plenum attached to the top
  • Corrugated metal roofing and metal trusses above a ceiling mounted piece of HVAC equipment and a red chain hoist
  • Various sizes of flow valves and white pvc piping carrying chilled water to some of the equipment
  • Corrugated metal roofing and metal trusses above a rectangular opening in the cinderblock wall that has been capped with metal
  • Various sizes of white pvc piping carrying the supply and return water to some of the pad mounted HVAC equipment
  • Five white conduits snaking uniformly up the mechanical room wall and across the ceiling space
  • Home
  • About Us
  • Our Work
  • Our Skills
  • Our Team
  • Partner With Us
  • Contact Us
  • Our Facebook
  • Our LinkedIn
  • Engineering Feeds