naval support activity (nsa) portsmouth annex

Renovate BEQ 288

Built in 1998, Facility BEQ 288 is a five story,  84,458 SF building with 105 residential unit located at the Naval Support Activity Hampton Roads, Portsmouth Annex in Virginia. This project was to repair and renovate the inadequate Mechanical systems that contributed to mold growth and the compromise of the architectural finishes.

Location:  Virginia Beach, VA 

Owner:     Naval Support Activity (NSA) Portsmouth Annex

 Type:        Design

Budget:     $

Renovate BEQ 288

Project Info Continued ….

The Facility includes a one-story annex, which houses the main lobby with the reception counter, administrative offices and other ancillary spaces. A one story Utility building 290 adjacent to BEQ 288 houses the mechanical equipment, which provides system support to the entire Facility.

Mechanical systems replaced included the heating, ventilation, air conditioning systems (HVAC) and associated equipment consisting of ductwork, piping, thermostat controls, occupancy sensors, exhaust systems and testing.  So that the mechanical systems could be monitored a new direct digital control system was integrated into the existing base-wide system. This was all in an effort to correct apparent humidity issues that were promoting the growth of mold, mildew and fungal spores.  Repairs are also included remediation and other minor corrective actions related to accomplish the work.

Special Mechanical Systems designed for the project consisted of a 4 pipe fan coil system for the most life-cycle cost effectiveness. The system contains an air-cooled chiller supplying chilled water to each of the fan coil units, and two natural gas-fired boilers to deliver hot water to the fan coil units. The building was designed to achieve at least 20% energy consumption reduction from the ASHRAE 90.1-2013 baseline system.

Utility meters measuring water, natural gas, and electricity were connected to the building automation system (BAS).  A flow meter also connected to the BAS is to measure the outdoor airflow rate.

Other repair work included electrical services in support of BEQ 288 building renovations including parking lot lighting, automatic lighting controls and  occupancy sensors in bathrooms and shared areas. Fire protection systems were modified to coordinate with the HVAC system replacement and the ceiling removal and the new sprinklers throughout. The existing fire alarm system was also modified including duct smoke detectors and carbon monoxide detectors. The plumbing system with fixtures provided new sinks, water closets, hung lavatories and flow resrtricted shower heads. A new 10 gallon, shelf mounted, water heater in the existing Janitor’s Closet and re-routde hot water piping was handled in the Admin Building as well. In the Mechanical Building the existing hot water storage tank, steam heat exchanger was demolished and a new 1,000 gallon storage tank to store water.

TELECOMMUNIATIONS
New CAT 6 cable was provided in the conduits. New face plates, raceways, and network drops were provided in both walls and lobby desk casework. Network drops were also provided for lobby wall mounted television and network printers.

 other project types

serving clients like NAS Oceana, SEAL Teams and Newport News Shipbuilding   

Federal & State

serving clients like VCU, UVA, and college of william & mary  

Higher Education

serving clients like carter machinery and jefferson national accelerator facility

 

Manufacturing & Industrial

serving clients like doubletree hotel, virginia beach 

 

Commercial

serving clients like OBICI, RIVERSIDE REGIONAL MEDICAL, chkd and bon secours

Healthcare

serving clients like chrysler museum, franklin library and the children’s  museum

Historical Sites & Cultural Centers

Our Facebook Our LinkedIn Engineering Feeds